We are submitting hereunder an interesting comparison between
pneumatic shot blasting process
for your study. The comparison
clearly establishes the technical
superiority of airless shot
blasting process and confirms
that it is the most economical
process. |
1.
Centrifugal shot blasting process
is also known as the airless
shot blasting process / wheelabrator
process and is highly energy
efficient cleaning process and
specially recommended for the
high volume blast cleaning application. This process
is highly economical and gives
the lowest cost if compared
with the pneumatic shot blasting
process. |
2.
The shot blasting cleaning rate
is the proportional to the flow
rate of shots thrown by throwing
device like nozzle in case of
pneumatic shot blasting process
and centrifugal wheel in case
of centrifugal shot blasting
process. |
3.
By 20 HP of air compressor,
the pneumatic shot blasting
process propels 300 kg. Per
hour steel shots while centrifugal
blast wheel with 20 HP can propels
10500 Kg. Of steel shots per
hour. As such, the process is
power efficient. In
view of this, we find that the
centrifugal shot blasting process
is 30 times more power efficient
than pneumatic shot blasting
process.
|
4. The Nozzle size 9/16" dia of
pneumatic shot blasting process
operating by 80 HP compressor
gives a profile of blast pattern
of 5" dia only whereas
the blast pattern achieved for
centrifugal blast wheel is 40"
long X 4" wide as
depicted in the figure is achieved
by the 20 HP blast wheel motor.
This shows a much bigger and
uniform pattern (160 sq. inch
by airless shot blasting machine
and 20 sq. inch by a pneumatic
shot blasting machine) is available
by airless shot blasting machines.
Thus airless shot blasting machine
is better to deliver consistent
blasting result than pneumatic
shot blasting machine. Pneumatic
shot blasting machines are better
for low production rates and
for the internal blast cleaning
of pipes and intricate components. |
5. It is
general false feeling that the
maintenance of centrifugal shot
blasting machines is on higher
side in comparison to pneumatic
shot blasting machines. This is misconception. Normally
we use to compare the maintenance
cost of propelling 300 kg. Per
hour of shots by pneumatic shot
blasting process to 10500 kg.
Per hour of shots by centrifugal
shot blasting process which
is not correct. We should compare
what will be maintenance cost
of pneumatic shot blasting process
for propelling 10500 kg. Per
hour of shots. |
6. In pneumatic
shot blasting process 300 kg.
Of shots are propelled per hour
while in centrifugal shot blasting
process 10500 kg. of shots are
propelled resulting into lower